100 WVIA Way
Pittston, PA 18640

Phone: 570-826-6144
Fax: 570-655-1180

Copyright © 2025 WVIA, all rights reserved. WVIA is a 501(c)(3) not-for-profit organization.
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Arrival of the Crane

Season 1 Episode 4 | 2m 59s

Project Manager Pat Feehan and his team must work around the clock to assemble the newly arrived crane before the hectic Thanksgiving holiday. However, with only 24 hours remaining and limited street space available, the crane must be constructed from the ground up — a process that requires the most meticulous of calculations.

Extras
See how Site Manager Cao Ping works around the clock to ensure the resort’s completion.
The torrential rain proves to be an obstacle for the construction crew of Ice World.
Complications over the quarry’s structure causes the team to go back to the drawing board.
Watch the nature-defying plan to turn a sub-tropical wasteland into a sub-zero ski resort.
Construction for Ice World is brought to a halt due to the COVID-19 pandemic.
Watch the nature-defying plan to turn a sub-tropical wasteland into a sub-zero ski resort.
See the groundbreaking design work of Architect Gregg Pasquarelli and his team.
High stakes are on the line when the concrete distribution begins.
Follow the construction of the skinniest skyscraper in the world.
Follow the construction of the skinniest skyscraper in the world.
Latest Episodes
Watch the nature-defying plan to turn a sub-tropical wasteland into a sub-zero ski resort.
Follow the construction of the skinniest skyscraper in the world.
Follow the construction of a multi-million dollar home sitting above and below water.
Can six sand islands be transformed into the most luxurious holiday destination on earth?
Follow the complex construction of a unique skyscraper with its skeleton on the outside.