100 WVIA Way
Pittston, PA 18640

Phone: 570-826-6144
Fax: 570-655-1180

Copyright © 2024 WVIA, all rights reserved. WVIA is a 501(c)(3) not-for-profit organization.
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Ep. 2: Empty Houses | Detroit. One House at a Time

4m 16s

Soon after setting foot in the front door, the Polks decided that this house would become their home. As family friend Jamal Johnson recalls their first visit, “We didn’t even make it upstairs, and I said, ‘This is the one.’” ??

Funding for THIS OLD HOUSE is provided by The Home Depot and Leesa.
Extras
Work begins on the 1887 Victorian to make it suitable for multigenerational living.
A new project begins - an 1887 Victorian being renovated for multigenerational living.
This Old House turns their tired, 19th century 2.5 bedroom house, into a 3 generation gem
Take a sneak peek at TOH Detroit in our Web series finale. TOH episodes return March 30.
Go behind the scenes in Detroit to learn more about the unique renovation process
Meet the amazing city that’s revitalizing its distinctive architectural style
Go behind the scenes of This Old House Season 37 in Detroit
The 36th Season of This Old House renovates a Victorian Shingle-Style home in Belmont, MA
Homes for Our Troops is making Matt DeWitt's home accessible for him and his family.
The freedom of an accessible home allows Joe Beimfohr to explore his athletic passions.
Latest Episodes
All
  • All
  • Lexington / Glen Ridge
  • Atlanta / Newburyport / Ipswich
  • Concord Country Cape
  • Seaside Victorian Cottage
  • This Old House
  • Jamestown Net-Zero House
  • This Old House
  • This Old House Season 36
  • This Old House Season 35
Restoration of the 1887 Victorian in Glen Ridge, NJ is complete. The crew gets a tour.
A built-in bench is constructed. The primary bathroom vanity gets a new durable finish.
A baseboard detail becomes a focal point, and a prefabricated shower niche is installed.
A new brick walkway and wood fiber insulation are installed. ERVs and HRVs are discussed.
A custom jamb and threshold are built. Various water-resistive barriers are compared.
A trip is taken to the Empire State Building and the new plumbing system is discussed.
The new two-story addition is framed, and plumbing pipes are isolated from cold weather.
Termite damage is discovered. A high school student works as a framer on the project.
Work begins on the 1887 Victorian to make it suitable for multigenerational living.
A new project begins - an 1887 Victorian being renovated for multigenerational living.